Our
Projects.

  • 275 / 33kV GIS Consumer Landing Station (CLS), Johor
  • 33 kV Downstream
  • 275 / 33kV GIS Consumer Landing Station (CLS), Johor
  • 33 kV Underground Cabling Work (UGC)
  • 275 / 33kV GIS Consumer Landing Station (CLS), Johor
  • 170MW Data Center
  • 132 / 33kV GIS Consumer Landing Station (CLS), Johor
  • 150MW Data Center
Completion : March 2024
  • 275 / 33kV GIS Consumer Landing Station (CLS), Johor
  • 300 MW Data Center
Completion : May 2024
  • Supply & install new extension for Fiber optic cable under TM & Time
  • Infrastructure & Fiber Optic work
  • Owner: TM & TIME
Client : Kejuruteraan Megajaring Sdn Bhd
Completion : 2020

Damansara – Shah Alam (DASH)

  • Drainage and Reinforced concrete retaining wall RC work
  • Owner: DASH Highway
Client : Panzana Enterprise Sdn Bhd
Completion : 2021
  • 30MWac Large Scale Solar Photovoltaic Plant Development
  • Electrical Works (Solar System)
  • Owner: KBJ Hecmy Sdn Bhd
Client : ERS Energy Sdn Bhd
Completion : 2020
  • PMU Tasek, 132kV
  • Project Management
  • Engineering
  • Erection
  • Civil construction of Primary
  • Secondary Equipment
Client : Hasilwan (M) Sdn Bhd
Completion : 2020

PMU Tanah Merah Primary and Secondary R&R

  • 132kV bays
  • Project Management
  • Engineering, Erection
  • Civil Construction of Primary & Secondary equipment
Client : Auconpro Engineering Sdn Bhd
Completion : 2020
  • PMU 275/132kV PMU Kampung Awah, Primary and Secondary R&R
  • Engineering for replacement of primary & secondary equipment
Client : SEE Engineering Sdn Bhd
Completion : 2020

PMU Bukit Tarek – Total upgrade of Siemens SCS to ABB IEC 61850 system

  • 500/ 275 kV
  • Conversion of SCS systems into IEC61850 IED devices and site retrofitting

Client : Auconpro Engineering Sdn Bhd
Completion : 2021

Honest Sam Quarry

  • TNB 33kV (13.0 MW) Power Supply
  • Electrical works (HT Power)
  • Owner: Honest Sam Development
Client : Honest Sam Development Sdn Bhd
Completion : 2021
  • 100MWac Large Scale Solar Photovoltaic Plant Development
  • Electrical Works (Solar System)
  • Owner: LSS3 Perkan Sdn Bhd
Client : ERS Energy Sdn Bhd
Completion : 2021
  • PMU 275/132kV Kampung Awah
  • Replacement or primary and secondary equipment
Client : Reltech Ventures Sdn Bhd
Completion : 2022
  • PMU 132/33kV Teluk Ewa
  • Replacement or Reactor and secondary equipment
Client : Anpec Gobal Sdn Bhd
Completion : 2022

PNB KL118 Tower

  • Temporary Lighting Supply & Install
  • Electrical works
  • Owner: PNB
Client : Samsung C&T UEM JV Sdn Bhd
Completion : 2022

PNB KL118 Tower

  • Temporary Power Supply
  • 11kV (4.2 MW)
  • Electrical (HT Power)
  • Owner: PNB
Client : Samsung C&T UEM JV Sdn Bhd
Completion : 2022
  • 132/33kV GIS Consumer Landing Station (CLS), Johor
  • 100MW Data Center
Completion : March 2024
  • 275/33kV AIS Consumer Landing Station (CLS), Johor
  • 300MW Malaysian Data Center
Completion : 2023
  • 275/33kV AIS Consumer Landing Station (CLS), Johor
  • 450MW European Data Center
Completion : 2024
SK-Nexilis-Malaysia-Plant-Project-Kota-Kinabalu-Sabah

SK Nexilis Malaysia

  • C & S works
  • Owner: SK Nexilis
Client : Hyundai Engineering Co., Ltd.
Completion : 2023
SK-Nexilis-Malaysia-Plant-Project-Kota-Kinabalu-Sabah

SK Nexilis Malaysia Plant Project – Kota Kinabalu – Sabah

  • Temporary Power Supply
  • Electrical (LV Power)
  • Owner: SK Nexilis
Client : Hyundai Engineering Co., Ltd.
Completion : 2023
Lake City Project - Kepong - Selangor

Lake City Project – Kepong, Selangor

  • Temporary Power Supply
  • 11kV
  • Electrical
  • Owner: Lake City
Client : Lake City KL North Sdn Bhd
Completion : 2023
  • Polis Diraja Malaysia at Bidor Perak
  • Mechanical and Electrical Work
Client : RBA Engineering(M) Sdn Bhd
Completion : 2011

Changing 275kV Interposing VT for Power Plant (Paka, Kapar, Kuala Langat, Perlis, Powertek, Pasir Gudang, Segari) Supply of engineering, material, cable & site retrofitting of switchboard

Client : Pembinaan Tajri Sdn Bhd
Completion : 2012

PMU Junjong 275kV, Kedah System conversion of SCS to RTU

Client : ABB (M) Sdn Bhd
Completion : 2012

PMU Pasir Gudang 275kV, Johor Bahru System conversion of SCS to RTU

Client : ABB (M) Sdn Bhd
Completion : 2012

Civil Infrastructure and Fiber Optic Cabling System

Client : Digi Telecom Sdn Bhd
Completion : 2013

National Housing Scheme of Brunei Darussalam – 4,000 units
Structural & Architectural

Client : UEM Construction (B) Sdn Bhd
Completion : 2013

Celcom Networking system – Fiber Optic cabling

Client : Celcom Transmission (M) Sdn Bhd
Completion : 2016

PNB KL118 Tower – Hacking for Raft foundation
Civil work

Client : Samsung C&T UEM JV Sdn Bhd
Completion : 2017

PMU Lipat to PMU UMSG at Sabah
Civil Infrastructure for HT power cable works

Client : SYT Rasmart Enterprise
Completion : 2017

HT system for SESB infra at Sabah
Civil Infrastructure for HT power cable works

Client : KRS Technology (M) Sdn Bhd
Completion : 2017
  • Civil Infrastructure and Fiber Optic Cabling System
  • Infrastructure & Fiber Optic work
  • Owner: Digi
Client : Digi Telecom Sdn Bhd
Completion : 2017
  • PNB KL118 Tower
  • OSD Water Tank
  • RC work & M&E works
  • Owner: PNB
Client : Samsung C&T UEM JV Sdn Bhd
Completion : 2018
  • Damansara – Shah Alam (DASH)
  • Temporary Sheet Pipe work
  • Civil work
  • Owner: DASH Highway
Client : Panzana Enterprise Sdn Bhd
Completion : 2018
  • Civil Infrastructure and Fiber Optic Cabling System (HDD)
  • Infrastructure & Fiber Optic work
  • Owner: Digi
Client : Digi Telecom Sdn Bhd
Completion : 2019
  • Civil Infrastructure and Fiber Optic Cabling System (HDD)
  • Infrastructure & Fiber Optic work
  • Owner: Celcom
Client : Redtone Telecommunications Sdn Bhd
Completion : 2019

PMU UTM-Skudai, Saleng, Senai 132kV T-Off Supply, engineering & site installation of CRP

Client : Pembinaan Tajri Sdn Bhd
Completion : 2012

R&R Phase 3, Mainhead A Relay Retrofitting, Northern regions (275kV & 132kV, 7 substations, 20 bays, double busbar to 1 1/2 CB systems) Supply, engineering & site installation

Client : Zafas Sdn Bhd
Completion : 2012

PMU Connaught Bridge 275kV Generator Bay Extension Total contract on extending a new 275kV Generator Bay

Client : Toshiba Transmission & Distribution Systems Asia Sdn Bhd
Completion : 2015

PMU Pork Klang, 275kV OHL Control & Relay retrofitting works

Client : Toshiba Transmission & Distributation Systems Asia Sdn Bhd
Completion : 2015

275/132kV PMU BTBN/PRGS/SKSP upgrading works for NPRI Control & Relay retrofitting works

Client : Hasilwan (M) Sdn Bhd
Completion : 2015

PMU 132kV Bkt Tengah Rehabilitation Works Control & protection retrofitting works

Client : Pembinaan Bukit Cheeding Sdn Bhd
Completion : 2015
  • Retrofitting of Existing Sicam E-RTU System at 132/66kV Penampang Substation Sabah.
  • Electrical Work (HT Power)
  • Owner: Sabah Energy Sdn Bhd
Client : PTIS Engineering Sdn Bhd
Completion : 2015

PMU 275kV Olak Lempit Low Impedance Busbar Protection New Low Impedance Busbar protection system to existing substation

Client : Hasilwan (M) Sdn Bhd
Completion : 2016

PMU 275/132kV Bukit Beruntung SGT R&R Control & protection panel & retrofitting works

Client : Bras Ventures Bhd
Completion : 2016

PMU 132kV Cahaya Baru Transformer extension Control & protection panel & retrofitting works

Client : Bras Ventures Bhd
Completion : 2017

PMU 132kV Larkin GIS Transformer Extension Control & protection panel & retrofitting works

Client : Bras Ventures Bhd
Completion : 2017

PMU 275kV Gurun East, SCS Conversion to IEC61850 IED Conversion of SCS systems into IEC61850 IED devices and site retrofitting

Client : Hasilwan (M) Sdn Bhd
Completion : 2017
  • TNB Dangwani PMU to P/E
  • Pipe Jacking for 33kV
  • Electrical Work (HT Power)
Client : Meridian 101 Degree Snd Bhd
Completion : 2017

TNB Titiwangsa PMU to Jalan Pahang PPU

  • 33kV
  • Infrastructure & Electrical work
  • Owner: TNB
Client : FMK Energy Sdn Bhd
Completion : 2017
  • Relocation TNB power cable & TM Fiber Optic cable
  • Infrastructure & Fiber Optic work
  • Owner: JKR
Client : RBBA Sdn Bhd
Completion : 2017

D & Y Textile (Malaysia) Sdn Bhd

  • 33kV (13.0 MW)
  • Electrical (HT Power)
  • Owner: D & Y Textile (Malaysia)
Client : D & Y Textile (Malaysia) Snd Bhd
Completion : 2017
  • 50MWac Large Scale Solar Photovoltaic Plant Development
  • Electrical Works (Solar System)
  • Owner: TNB Sepang Solar Sdn Bhd
Client : ERS Energy Sdn Bhd
Completion : 2018

2MWac Roof Solar System
Electrical Works (Solar System)
Owner: Toyota Assembly Services Sdn Bhd

Client : Panasonic Eco Solutions Malaysia Sdn Bhd
Completion : 2018
  • Leader Solar Energy 29MWac Solar Photovoltaic Plant at Kedah
  • Electrical Works (Solar System)
  • Owner: Leader Solar
Client : TNB Engineering Corporation Snd Bhd & ERS Energy Sdn Bhd
Completion : 2018

PMU Penampang

  • 132/66kV
  • T1/2/3 Full protection Upgrading

Project management & engineering for HV replacement and new CRP panels

Client : Hasilwan (M) Sdn Bhd
Completion : 2019
  • PMU Paka, 275kV
  • Engineering & site retrofitting for replacement of primary & secondary equipment
Client : Hasilwan (M) Sdn Bhd
Completion : 2019

KLCC – Lot LL1M

  • Temporary Power Supply
  • 11kV (1.5 MW)
  • Electrical works (HT Power)
  • Owner: Aram Moden Sdn Bhd
Client : Samsung C&T (KL) Sdn Bhd
Completion : 2019

Electrified Double Track from Gemas to Johor Bahru.

  • (HT power cable Relocation works)
  • Electrical works
  • Owner: Kerajaan Malaysia
Client : SIPP-YTL JV
Completion : 2019
  • PMU Paka, 275kV
  • Engineering & site retrofitting for replacement of primary & secondary equipment
Client : Hasilwan (M) Sdn Bhd
Completion : 2019

KLCC – Lot LL1M

  • Temporary Power Supply
  • 11kV (1.5 MW)
  • Electrical works (HT Power)
  • Owner: Aram Moden Sdn Bhd
Client : Samsung C&T(KL) Sdn Bhd
Completion : 2019

Testing & Repair, Servicing & Commissioning of Existing Electrical Works for the office building, Wangsa Maju, KL

Client : Felcra Berhad
Completion : 2001

Full Turnkey for Supply, Delivery, Install, T&C of Duct Infrastructure Network

Client : Digi Telecom Sdn Bhd
Completion : 2002

Supply and Installation of Electrical Works for the office

Client : Tylon (M) Sdn Bhd
Completion : 2002

Construction of 2-storey detached house on jalan Badik 11/4, Seksyen 11, 40100 Shah Alam

Client : Artisans Unlilmited (M) Sdn Bhd
Completion : 2002

Mechanical infra services and building services

Client : Cypark Sdn Bhd
Completion : 2002

Supply, Delivery, Install, T&C of M & E Services for Menara TA One

Client : TA Properties Sdn Bhd
Completion : 2002

Pusat Pentadbiran Kerajaan Persekutuan Putrajaya

Client : Cypark Sdn Bhd
Completion : 2002

Supply, Delivery, Install, T&C of M & E Services for Maybank Call Centre, Shah Alam

Client : Maybank Berhad
Completion : 2003

Supply, Delivery, Install, T&C of Electrical works at Heineken Factory, Hanoi, Vietnam

Client : ABB Malaysia Sdn Bhd
Completion : 2003

Manpower Supply to Install Electrical Works at Serdang Hospital

Client : Hitachi Plant Engineering
Completion : 2003

Supply, Delivery, Install, T&C of Electrical at Duta Plaza

Client : Hitachi Plant Engineering
Completion : 2003

Supply, Delivery, Install, T&C of Electrical Works at New Pantai Expressway

Client : Itramas Technology Sdn Bhd
Completion : 2004

Supply, Delivery, Install, T&C of 700 KVAR Power Factor Correction Boards

Client : The China Press Berhad
Completion : 2004

Supply, Delivery, Install, T&C of Lightning & Earthing System at Sin Chew Press New Factory

Client : Pemandangan Sinar Sdn Bhd
Completion : 2004

Supply, Delivery, Install, T&C of HT & LV Equipment at Sri Hartamas Shopping Complex.

Client : Kurihara (M) Sdn Bhd
Completion : 2004

275/132kV Gebeng Industry S/S (panel retrofitting) Engineering & site rectification

Client : Bras Ventures Sdn Bhd
Completion : 2004

Supply, Delivery, Install, T&C of Electrical, Telephone & Fire Protection at Kajang Villa

Client : Villaraya Sdn Bhd
Completion : 2004

HV/LV Distribution System (Internal) at Mile 5, Nabawan Road, Keningau, Sabah

Client : Java-Inc. Ind. Sdn Bhd
Completion : 2007

PMU Bkt Tarek 275kV, Selangor
Engineering

Client : AMBC Controls Sdn Bhd
Completion : 2007

PMU Bukit Merah 275/132kV Autotransformer Bay Consultancy, Engineering & panel retrofitting

Client : Toprank Corporation Sdn Bhd
Completion : 2009

Design, supply, install, T&C of the Electrical Facilities at Klang

Client : Hiap Soon HoongSdn Bhd
Completion : 2000

Additional and Alteration works to existing factory at Sungai Buloh

Client : Polycure Sdn Bhd
Completion : 2000

Submain cabling including LV Switchboard modification and setting works at Alam Sentral Plaza

Client : MRCB SelboumSdn Bhd
Completion : 2000

Complete Electrical, Mechanical and Telephone services for 2-storey neighborhood centre at Putrajaya

Client : Precinct 10 Sdn Bhd
Completion : 2001

Supply, Delivery, Install, T&C of 11KV Cable for Loop-2 Project in Kulim Hi-Tech

Client : Tulip Network Sdn Bhd
Completion : 2001

Supply and Installation of Electrical Works at Senawang

Client : T.I.P.P (M) Sdn Bhd
Completion : 2001

Tambahan ruang rekreasi dan gudang pada bangunan Pejabat 3 tingkat & gudang sediada di atas Lot 7, Di alamat at Klang.

Client : UE Construction Sdn Bhd
Completion : 2001

Relocation of Electrical Services at Sungai Buloh for UITM site

Client : UITM
Completion : 2008

PMU 275kV Kenyir S/S (relay retrofitting) Engineering, material & site retrofitting

Client : LR Heavy Engineering & Construction Sdn Bhd
Completion : 2008

Design, Construction, Equipping, Commissioning and Maintenance of New Healthcare Facilities, Renovation, Refurbishment Works

Client : Institut Jantung Negara
Completion : 2009
  • Universiti Teknologi Mara, Di Sungai Buloh, Selangor.
  • Electrical HT/LV System
Client : Kementerian Pengajian Tinggi Malaysia
Completion : 2009

PMU KL North/Jalan Pantai 275kV, PMU Vistion City/Jalan Imbi 132kV, KL Supply of cable, erection, testing

Client : ABB (M) Sdn Bhd
Completion : 2009
  • National Housing Scheme of Brunei Darussalam – 4,000 units
  • Electrical Work
Client : UEM Construction (B) Sdn Bhd
Completion : 2013
  • Coal Fired Power Plant
  • 700 MW x 3units
  • Tanjung Bin, Johor Baru
Client : Zelan Construction Sdn Bhd
Completion : 2005

Foundation and Reinforced Concrete Pipe Rack Works for Titan Butadine and Propylene Project at Pasir Gudang, Johor

Client : CTCI
Completion : 2007
  • Coal Fired Power Plant
  • 700MW x 2units,
  • Port Dickson, Negeri Sembilan
Client : Taisei Corporation
Completion : 2007

Foundation Works for Corn Silos on Mak Mandin Industrial Estate, Butterworth, Pulau Pinang

Client : Charoen Pokphand Feedmill (Butterworth) Sdn Bhd
Completion : 2008

Cadangan Kerja Tambahan ke Atas Bangunan Kilang Sediada Ann Joo Integrated Steel Sdn Bhd

Client : Ann Joo Integrated Steel Sdn Bhd
Completion : 2009